|
|
|||
|
|
|||
|
|
|
Pangea
Dump Model The computer graphic model of the Pangea proposal depicts most of the surface infrastructure clustered around the train unloading area. A special speed-limited train arrives and is unloaded, and the waste castors are then transferred a few kilometres to the dump site. |
|
the Anti-Nuclear Alliance of Western
Australia
email robin@anawa.org.au |